Commercial Horticulture Development protected cover project

----- Home / Industrial Subsidies / NHB / Commercial Horticulture Development protected cover project -----

GET IN TOUCH WITH OUR EXPERT

Commercial Horticulture Development in protected cover on project mode

National Horticulture Board (NHB) is an organization setup by Govt. of India under the Ministry of Agricultures and Farmers welfare. The main objective of this organization is to improve integrated development of Horticulture industry and to help in coordinating, sustaining the production and processing of fruits and vegetables. As a part of this mission, NHB has started the Commercial Horticulture Development in protected cover on project mode scheme

The components under this scheme will include

  1. Planting material, plantation, irrigation, fertigation, mechanization etc. for projects having area over 2500 Sq Meters
  2. In case of NE Region, projects having area over 1000 Sq. Meter are eligible
  3. Activities like construction of green houses, shade net house, plastic mulching, and plastic tunnel, anti bird /hail nets etc.

Pattern of assistance: Credit linked back-ended subsidy @ 50% of the total project cost limited to Rs 56.00 lakh per project

Plantations assisted under this scheme:

  • Flowers: Anthurium, Orchids, Rose, Lilium, Chrysanthemum, Carnation and Gerbera.
  • Vegetables: High value vegetables like Capsicum, Cucumber, Tomato.

Components Assisted under this scheme:

  1. Green House structure
    1. Fan & Pad system
    2. Naturally ventilated system
      1. Tubular structure
      2. Wooden structure
      3. Bamboo structure
  1. Shade Net House
    1. Tubular structure
    2. Wooden structure
    3. Bamboo structure
  2. Plastic Tunnel
  3. Walk in Tunnel
  4. Anti-Bird/Anti Hail Nets
  5. Cost of Planting Material and cultivation of High Value vegetables grown in Poly House/Shade net House
  6. Cost of Planting Material and cultivation of Orchid and Anthurium grown in Poly House/Shade net House
  7. Cost of Planting Material and cultivation of Carnation & Gerbera grown in Poly House/Shade net House
  8. Cost of Planting Material and cultivation of Rose &Lilium grown in Poly House/Shade net House
  9. Plastic Mulching

Important to remember:

  • Project should strictly comply with the prescribed NCCD Technical standards and protocols, else the project is not eligible for any financial assistance.
  • Detailed Project Reports, Technical Standards, Basic Data Sheet and Protocols should only be in the formats specified by the NHB.
  • All the details specified in Detail Project Report, Bank Appraisal report and Application should be same. If there is any mismatch in the information the project is liable for rejection.
  • Only one project per family or a legal entity is eligible for receiving the assistance under this scheme
  • The applicant should have ‘clear land title’ or ‘registered lease hold right’ over the land.
  • No work related to the project should be started before the approval from NHB
  • The lending bank should first appraise the project and only then sanction the term loan
  • The lending bank should not disburse the term loan before receiving approval from NHB
  • A Joint Inspection Team (JIT) consisting of representative from NHB, bank, Crop & Post Harvest Expert, State Hort./Agri. Department , Technical Expert will conduct joint inspection of the project in the presence of Applicant to inspect the project for its compliance to NHB scheme guidelines and requirements.
  • Competent committees constituted by NHB shall appraise the said project based on JIT report to decide subsidy claim and its amount with reasons/ grounds.

For more details about the scheme please contact us. We can help you with

  • Making error free applications to NHB with accurate Detailed Project Reports, Technical Standards, Basic Data Sheet and Protocols.
  • Reviewing Bank Appraisal Reports to check for any data inconsistencies
  • Maintaining the progress of the project as per the recommendations NHB
  • Assist you in the regular Joint Inspections and submission of follow-up documents to NHB
  • Represent your case before NHB for any difficulties faced in implementation of the project.

Our Unique Services

  1. Preparation of Detailed Project Reports (DPR)
  2. Layout Drawings
  3. Facilitating various permissions required from various Govt. Departments
  4. Error free application processing for various subsidies and incentives
  5. Facilitating the arrangement of subsidies and incentives from Govt. Departments
  6. Advisory on Purchase of Machinery / Technology and Civil works

 

Please fill the form to connect with our expert



Privacy Policy

 

Please fill the form to connect with our expert



Privacy Policy

whatsapp chat with unique exim